Modelling a road corridor through rock

Using Trimble Business Center – HCE, this video show you how to model through a rock surface for a road corridor. This is done using the Conditional Instruction.

GDA94 has updated to GDA2020

The Geocentric Datum of Australia was adjusted on 1 January 2017. This is to combat the movement of the tectonic plate on which Australia sits, more than 1.5m north-east since 1994. This movement creates discrepancies between local and global…

Wishing you a safe and happy Christmas break

Have a Merry Christmas and a happy, healthy and prosperous New Year. Thank you for your continued support. Our offices will be closed over Christmas – see the times.

Shortening jobs from 5 days to 3 and a half

Danielle from SITECH UK & Ireland talks about their customer, Phil Dalby Excavation Services, and its adoption of the Trimble 2D Flex System. Phil Dalby Excavation Services run a small excavator for things like patios, drainage, driveways,…

Be prepared for the leap second

,
A leap second has been added to 2016. It will occur at midnight on the 31st December (UTC). The last occurred on the 30th June. Chances are, if you didn’t notice the first one, and you’ve kept your firmware and software up to date, you…