No room for error at 322 km/h

Racetracks are often one of the most demanding jobs. The paving needs to be smooth - at 322 kilometres per hour (or 200 miles per hour) there is no room for error. Scotty’s Contracting & Stone were well aware of this when constructing…

Shortening jobs from 5 days to 3 and a half

Danielle from SITECH UK & Ireland talks about their customer, Phil Dalby Excavation Services, and its adoption of the Trimble 2D Flex System. Phil Dalby Excavation Services run a small excavator for things like patios, drainage, driveways,…

Tight tolerances required for airport repaving

Suit-Kote won the job of resurfacing the 2 126meter long by 45 meter wide Ithaca-Thompkins airport runway. The Federal Aviation Administration mandates tight tolerances for airports. This combined with a tight deadline, the airport was shut…

Planning For the Road Ahead

Project Company, Brenner Basistunnel BBT SE was able to avoid major errors, whilst saving time and money by revising their scheduling solution early. The Brenner Pass is infamous for its traffic jams, being the primary connection between…

Scottish Wetlands Project Streamlined

With the aim of treating heavily polluted stormwater from two overflow streams, the Cowdenbeath Wetlands Project was created in 2013. Ground Developments Ltd (GDL) was hired to carry out specialist geotechnical and remediation work for the project. The…